Track Construction

bahnhofkonstr

The construction of a H-Bahn track is based on a modular concept: The ready-made columns and beams are assembled on location.

In this way the H-Bahn network at Dortmund University was extended by 1.2 kilometers to the science park located nearby in 2003.



Notice: Undefined index: ueberschrift in /html/wp-content/themes/h-bahn/page-track-construction.php on line 15

phase1Phase 1: Foundations
First, the foundations for the guideway columns are laid at the planned location. Because of the 25-30 meter distance between two columns, the required space for the guideway is minimal.



Notice: Undefined index: ueberschrift in /html/wp-content/themes/h-bahn/page-track-construction.php on line 15

phase2Phase 2: Mount the supports
The seperate columns can be erected on the prepared foundations in no time.
Interference with other traffic can be avoided



Notice: Undefined index: ueberschrift in /html/wp-content/themes/h-bahn/page-track-construction.php on line 15

phase3Phase 3: Mount the carriageway
Finally, the completely equipped beams are delivered to the location and mounted on the columns.