Phase 1: Foundations
First, the foundations for the guideway columns are laid at the planned location. Because of the 25-30 meter distance between two columns, the required space for the guideway is minimal.
Phase 2: Mount the supports
The seperate columns can be erected on the prepared foundations in no time.
Interference with other traffic can be avoided.
Phase 3: Mount the carriageway
Finally, the completely equipped beams are delivered to the location and mounted on the columns.